MeasureFloorPlan

Home › Learn › Construction Abbreviations on Blueprints: A List by Trade

Part of: What Is a Takeoff in Construction? How to Do One From Plans

Construction Abbreviations on Blueprints: A List by Trade

Construction Abbreviations on Blueprints: A List by Trade

Construction abbreviations are the short codes architects and engineers write on blueprints to save space: TYP for typical, AFF for above finished floor, OC for on center. The list below groups the common ones by trade, but the abbreviation list inside the plan set you are bidding always wins. It is one of the first things to check when you read blueprints for a takeoff.

Measure Plans in Minutes

Upload your full plan set. Get every length, area and count. Export the takeoff to Excel.

A floor plan drawing, not a photo of a room.
Plans from $9 a month. 100% money-back guarantee.

Where do you find the abbreviations in a plan set?

Check the general sheets at the front of the set first. That is where the cover, sheet index, symbols legend and general notes live, and the abbreviation list usually sits with them. A 2025 University of Maine bid set, for example, puts symbols and abbreviations on sheet GI002, right after the cover sheet.

Some owners split the list by discipline. The Department of Veterans Affairs, for one, publishes plumbing abbreviations separately from its architectural ones, so check the first sheet of each trade too. If you are not sure which sheets come first, see what each sheet in a construction plan set is for.

Is there one standard list of blueprint abbreviations?

Not one that every office follows. The U.S. National CAD Standard, published by the National Institute of Building Sciences, includes a Uniform Drawing System with its own terms and abbreviations file. Agencies and firms also keep house lists, and they do not always agree.

The Department of Veterans Affairs is a good example. Its architectural abbreviation sheets use ACT for acoustical ceiling tile and GYP BD for gypsum board. Its finish schedule spec (section 09 06 00) uses AT for the same ceiling tile and GWB for gypsum wallboard, and reserves CPT for carpet modular tile. Same agency, two codes. Punctuation also varies: some sets write A.F.F. and V.I.F. with periods, while the VA sheets drop them.

Construction abbreviations list by category

These are architectural drawing abbreviations most estimators run into, grouped the way you meet them on the sheets. Where an abbreviation has more than one meaning, the second one is in parentheses, and the sheet it appears on tells you which applies.

AbbreviationMeaningSource
General and dimensions
AFFAbove finished floorVA
APPROXApproximateVA
BOTBottomVA
CLCenter lineVA
CLRClearVA
DETDetailVA
DIMDimensionVA
DWGDrawingVA
ELElevationVA
EQEqualVA
EXISTExistingVA
HTHeightVA
MAX / MINMaximum / minimumVA
NICNot in contractVA
NOMNominalVA
NTSNot to scaleW
OCOn centerVA
REQDRequiredVA
SCHEDScheduleVA
SECTSectionVA
SHTSheetVA
SIMSimilarVA
THKThicknessVA
TYPTypicalVA
UNOUnless noted otherwiseW
VIFVerify in fieldVA
Quantities and units
EAEachVA
LFLinear feetWSDOT
SFSquare foot (feet)VA
SQ YDSquare yardVA
CU YDCubic yardVA
QTYQuantityVA
PRPairVA
Materials
ALUMAluminumVA
CMUConcrete masonry unitVA
CONCConcreteVA
GALVGalvanic or galvanizedVA
GLGlassVA
GYP BDGypsum boardVA
GWBGypsum wallboardVA-F
INSULInsulationVA
MTLMetalVA
PLAMPlastic laminateVA
PLYWDPlywoodVA
STLSteelW
WDWoodVA
Doors and windows
DRDoor (also drain or dressing room)VA
DR FRDoor frameVA
DR OPNGDoor openingVA
DBL GLZDouble glazeVA
HCHollow coreVA
HDRHeaderVA
HMHollow metal (also hectometer)VA
LVRLouverVA
MOMasonry opening or motorVA
RORough openingVA
SCSolid core (also shading coefficient)VA
WDWWindowVA
Structural
BMBeam or benchmarkVA
BRGBearingVA
COLColumnVA
EJExpansion jointVA
FTGFootingVA
REINFReinforceVA
STL JSTSteel joistVA
STRUCTStructuralVA
TO FDNTop of foundationVA
TOSTop of steelVA
TOWTop of wallVA
WWFWelded wire fabricVA
Mechanical, electrical and plumbing
AHUAir handling unitVA
DIFFDiffuser (also difference)VA
ELECElectricVA
FAFire alarmVA
FDFloor drainVA
HBHose bibbVA
HVACHeating, ventilating and air conditioningVA
J-BOXJunction boxVA
LAVLavatoryVA
LTGLightingVA
MECHMechanicalVA
PLBGPlumbingVA
RECPTReceptacleVA
SDSmoke detector (also shop drawings)VA
SWSwitchVA
VTRVent through roofVA
WCWater closet (also wall covering)VA
WHWater heaterVA
Finishes
ACTAcoustical ceiling tileVA
CLGCeilingVA
CLG HTCeiling heightVA
CPTCarpetVA
CTCeramic tileVA
FINFinishVA
FIN FLRFinish floorVA
FOFFace of finishVA
FOSFace of slab or face of studVA
PTPaintVA
RBResilient base or rubber baseVA
RCPReflected ceiling planVA
SUSP CLGSuspended ceilingVA
VCTVinyl composition tile (also vitrified clay tile)VA

VA: Department of Veterans Affairs architectural abbreviation standard detail sheets (SD000115, December 2008). VA-F: VA specification section 09 06 00, Schedule for Finishes. W: Wikipedia, Engineering drawing abbreviations and symbols. WSDOT: Washington State DOT Terminal Design Manual, Appendix A.

Which abbreviations change your takeoff?

Most abbreviations just name a thing. A handful tell you how far a note reaches, whether you can trust the drawing, or whether the work is yours at all. Those are the ones that move quantities.

The Wikipedia list of engineering drawing abbreviations even flags UNO as one to spell out to avoid confusion. When a note is that easy to misread, a quick RFI costs less than a bad bid.

Heights marked AFF or CLG HT are measured up from the floor, which is easiest to see in a cut through the building. For how those vertical dimensions show up, see how to read a section drawing.

FIN FLRCLG9'-0"CLG HT1'-6" AFFRECPT, TYP

Worked example: reading an abbreviated wall note

Say a partition on the floor plan carries this note: 2x4 WD STUDS @ 16" OC, GYP BD EA SIDE, TYP. The wall is 24 feet long and the room schedule gives a CLG HT of 9'-0". Spelled out, that is 2x4 wood studs at 16 inches on center with gypsum board on each side, and the same build applies at every similar wall.

ItemMathQuantity
Stud spaces24 ft x 12 in / 16 in OC18 spaces
Studs18 spaces + 1 end stud19 EA
Plates24 LF x 2 (top and bottom)48 LF
Gypsum board24 LF x 9 ft x 2 sides432 SF

That count is layout only. Corners, openings and any double top plate called for in the details get added on top. The TYP is what makes this note matter: if ten similar walls total 180 LF, the board alone is 180 x 9 x 2 = 3,240 SF, all from one short note.

Keep units consistent while you do this. LF, SF, SQ YD and CU YD all appear on drawings and in specs, and the construction units of measure guide covers how to convert between them.

Abbreviations vs symbols on drawings

Abbreviations are text. Symbols are graphics: door swings, section cut marks, outlet and switch marks, material hatches. The Maine set above puts both on one general sheet, but they are still separate legends. For the graphic side, use this architectural symbols reference.

Measuring once you can read the notes

Once the notes make sense, the measuring is the slow part. In MeasureFloorPlan you upload the whole PDF set, set the scale on each sheet from one printed dimension, then click runs for linear feet, trace rooms for floor, wall and ceiling area, and count fixtures and outlets. The takeoff exports to Excel or PDF. More on that in blueprint reading software.

Measure Plans in Minutes

Upload your full plan set. Get every length, area and count. Export the takeoff to Excel.

A floor plan drawing, not a photo of a room.
Plans from $9 a month. 100% money-back guarantee.

Frequently Asked Questions

Is there a standard list of construction abbreviations?

There are published lists, such as the terms and abbreviations that come with the U.S. National CAD Standard and the architectural abbreviation sheets from the Department of Veterans Affairs. No single list binds every architect, though. The abbreviation list in the plan set you are bidding is the one that counts.

What does TYP mean on a drawing?

TYP means typical. A note or dimension marked TYP applies to every similar condition on the sheet, not just the one it points at. For a takeoff, that usually means one note covers many locations you still have to count.

What is the difference between TYP and SIM?

TYP says the same thing repeats as drawn. SIM means similar, so the condition is built like the referenced one but is not identical. Check what differs before you copy quantities from one SIM location to another.

Where are the abbreviations on a set of plans?

Look at the general sheets at the front of the set, the ones with the cover, sheet index, symbols and general notes. Some owners also keep separate lists by trade, so check the first sheet of the plumbing, mechanical and electrical drawings too.

What does NIC mean in construction?

NIC means not in contract. Work marked NIC is shown for reference but is not part of the bid, so leave it out of your quantities and say so in your bid exclusions.

Measure Plans in Minutes

Upload your full plan set. Get every length, area and count. Export the takeoff to Excel.

A floor plan drawing, not a photo of a room.
Plans from $9 a month. 100% money-back guarantee.